| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20060545 | Name of Scheme: MAHITAPUR GOGP JJM | No. of Villages: 2 | No. of Habitation Covered: 5 |
| Total Population Covered: 7180 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Aug-2024 | Actual Date of Completion (Capex): 24-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18M/50M | MAHITAPUR | 27.270132 | 79.854075 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 88.8M³/45M | MAHITAPUR | 27.270132 | 79.854075 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 425KL/16M | MAHITAPUR | 27.270132 | 79.854075 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 200 | 0.036 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN:6 | 63 | 7.372 | |
| 2 | HDPE PIPE PN:6 | 75 | 4.111 | |
| 3 | HDPE PIPE PN:6 | 90 | 2.185 | |
| 4 | HDPE PIPE PN:6 | 110 | 0.756 | |
| 5 | HDPE PIPE PN:6 | 125 | 0.853 | |
| 6 | HDPE PIPE PN:6 | 140 | 1.533 | |
| 7 | HDPE PIPE PN:6 | 160 | 1.046 | |
| 8 | HDPE PIPE PN:6 | 180 | 0.202 | |
| 9 | HDPE PIPE PN:6 | 200 | 0.115 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1250 |