Project Completion Certificate (Ground Water)
Scheme ID: 20060629 Name of Scheme: CHAUSAR (GOGP) JJM No. of Villages: 3 No. of Habitation Covered: 8
Total Population Covered: 8290 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Aug-2024 Actual Date of Completion (Capex): 25-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M / 248M CHAUSAR 27.244404 79.826185
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 103.2M³/47M CHAUSAR 27.244404 79.826185
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 500KL/18M CHAUSAR 27.244404 79.826185
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.002
2 DI PIPE 250 0.039
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 7.611
2 HDPE PIPE PN:-6 75 3.984
3 HDPE PIPE PN:-6 90 4.804
4 HDPE PIPE PN:-6 110 0.568
5 HDPE PIPE PN:-6 125 0.448
6 HDPE PIPE PN:-6 140 2.612
7 HDPE PIPE PN:-6 160 2.884
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 1.725
HSC Connection
Sno. Total Nos.
1 1360
Other Details
4.49
0.00
5.02
24-Jul-2025
25-Sep-2025