Project Completion Certificate (Ground Water)
Scheme ID: 20060656 Name of Scheme: RARI (GOGP) JJM No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2930 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Aug-2024 Actual Date of Completion (Capex): 08-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24M/116M RARI 27.755931 80.117842
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 37.2M³/45M RARI 27.755931 80.117842
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200KL/16M RARI 27.755931 80.117842
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.001
2 DI PIPE 150 0.026
3 DI PIPE 200 0.002
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 1.986
2 HDPE PIPE PN:-6 75 1.792
3 HDPE PIPE PN:-6 90 1.337
4 HDPE PIPE PN:-6 110 0.365
5 HDPE PIPE PN:-6 125 0.538
6 HDPE PIPE PN:-6 140 1.935
7 HDPE PIPE PN:-6 160 0.700
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.551
HSC Connection
Sno. Total Nos.
1 543
Other Details
2.43
0.00
2.44
07-Jun-2025
28-Sep-2025