Project Completion Certificate (Ground Water)
Scheme ID: 20060700 Name of Scheme: BARNAI CHATARKHA JJM No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 5730 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 23-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 16M/50M BARNAI CHATARKHA 27.298141 79.858653
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 72.6M³/41M BARNAI CHATARKHA 27.298141 79.858653
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350KL/12M BARNAI CHATARKHA 27.298141 79.858653
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.041
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 6.637
2 HDPE PIPE PN:-6 75 4.311
3 HDPE PIPE PN:-6 90 1.739
4 HDPE PIPE PN:-6 110 4.502
5 HDPE PIPE PN:-6 125 0.00
6 HDPE PIPE PN:-6 140 0.709
7 HDPE PIPE PN:-6 160 0.515
8 HDPE PIPE PN:-6 180 0.337
9 HDPE PIPE PN:-6 200 0.777
HSC Connection
Sno. Total Nos.
1 1034
Other Details
3.36
0.00
3.60
22-Jun-2025
25-Sep-2025