Project Completion Certificate (Ground Water)
Scheme ID: 20061185 Name of Scheme: LAMKAN JJM No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4510 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 27-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27M/123M LAMKAN 27.316564 79.899334
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 56.4M³/47M LAMKAN 27.316564 79.899334
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275KL/18M LAMKAN 27.316564 79.899334
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.002
2 DI PIPE 200 0.033
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.889
2 HDPE PIPE PN:-6 75 2.982
3 HDPE PIPE PN:-6 90 1.086
4 HDPE PIPE PN:-6 110 0.290
5 HDPE PIPE PN:-6 125 2.142
6 HDPE PIPE PN:-6 140 2.58
7 HDPE PIPE PN:-6 160 0.00
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 1.700
HSC Connection
Sno. Total Nos.
1 806
Other Details
3.33
0.00
3.49
26-Jul-2025
25-Sep-2025