Project Completion Certificate (Ground Water)
Scheme ID: 20061201 Name of Scheme: AKHWAILPUR MALWA (GOGP) JJM No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 4390 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Aug-2024 Actual Date of Completion (Capex): 07-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M/116M AKHWAILPUR MALWA 27.347745 79.949773
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 55.2M³/45M AKHWAILPUR MALWA 27.347745 79.949773
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275KL/16M AKHWAILPUR MALWA 27.347745 79.949773
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.034
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.97
2 HDPE PIPE PN:-6 75 2.089
3 HDPE PIPE PN:-6 90 2.277
4 HDPE PIPE PN:-6 110 1.740
5 HDPE PIPE PN:-6 125 1.246
6 HDPE PIPE PN:-6 140 0.631
7 HDPE PIPE PN:-6 160 0.230
8 HDPE PIPE PN:-6 180 0.089
9 HDPE PIPE PN:-6 200 0.077
HSC Connection
Sno. Total Nos.
1 1005
Other Details
2.98
0.00
2.98
06-Aug-2025
25-Sep-2025