Project Completion Certificate (Ground Water)
Scheme ID: 20061222 Name of Scheme: BARAULI (GOGP) JJM No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2610 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Aug-2024 Actual Date of Completion (Capex): 18-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18 M / 109 M BARAULI GOGP 27.267753 79.944385
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 32.4 M³ / 41 M BARAULI GOGP 27.267753 79.944385
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 KL, 12 M BARAULI GOGP 27.267753 79.944385
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe Class:-K-7 80 0.002
2 D.I. Pipe Class:-K-7 150 0.033
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 2.631
2 HDPE Pipe PN-6: Class PE-100 75 1.782
3 HDPE Pipe PN-6: Class PE-100 90 2.422
4 HDPE Pipe PN-6: Class PE-100 110 0.150
5 HDPE Pipe PN-6: Class PE-100 125 0.572
6 HDPE Pipe PN-6: Class PE-100 140 0.026
7 HDPE Pipe PN-6: Class PE-100 160 0.017
8 HDPE Pipe PN-6: Class PE-100 180 0.00
9 HDPE Pipe PN-6: Class PE-100 200 0.00
HSC Connection
Sno. Total Nos.
Other Details
1.94
0.00
2.12
17-Jun-2025
25-Sep-2025