| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20061222 | Name of Scheme: BARAULI (GOGP) JJM | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 2610 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Aug-2024 | Actual Date of Completion (Capex): 18-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18 M / 109 M | BARAULI GOGP | 27.267753 | 79.944385 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 32.4 M³ / 41 M | BARAULI GOGP | 27.267753 | 79.944385 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175 KL, 12 M | BARAULI GOGP | 27.267753 | 79.944385 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe Class:-K-7 | 80 | 0.002 | |
| 2 | D.I. Pipe Class:-K-7 | 150 | 0.033 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 2.631 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 1.782 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 2.422 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.150 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.572 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.026 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.017 | |
| 8 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.00 | |
| 9 | HDPE Pipe PN-6: Class PE-100 | 200 | 0.00 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |