| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20062639 | Name of Scheme: FARIDPUR KALA Water supply scheme | No. of Villages: 2 | No. of Habitation Covered: 5 |
| Total Population Covered: 3350 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 17-Jan-2024 | Actual Date of Completion (Capex): 21-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Tubewell Assembly | 74.94/30.07 | FARIDPUR KALA | 26.585799 | 82.571212 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Ac Ubmersible Pump 15 HP | 0.75/48 | FARIDPUR KALA | 26.585799 | 82.571212 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 200 kL/18M | FARIDPUR KALA | 26.585799 | 82.571212 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.026 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6;Class PE-100 | 90 | 0.80 | |
| 2 | HDPE PIPE PN-6;Class PE-100 | 75 | 0.36 | |
| 3 | HDPE PIPE PN-6;Class PE-100 | 63 | 9.53 | |
| 4 | HDPE PIPE PN-6;Class PE-100 | 110 | 1.03 | |
| 5 | HDPE PIPE PN-6;Class PE-100 | 140 | 0.46 | |
| 6 | HDPE PIPE PN-6;Class PE-100 | 160 | 0.73 | |
| 7 | HDPE PIPE PN-6;Class PE-100 | 180 | 0.32 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 445 |