Project Completion Certificate (Ground Water)
Scheme ID: 20062684 Name of Scheme: MAKDOOM SARAY Water supply scheme No. of Villages: 3 No. of Habitation Covered: 9
Total Population Covered: 3900 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Mar-2024 Actual Date of Completion (Capex): 23-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 40.82/30.02 HITHUREE MAKDOOM SARAY 26.50866 82.597673
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 15 HP 0.81/44 HITHUREE MAKDOOM SARAY 26.50866 82.597673
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Rcc 225 kL/14M HITHUREE MAKDOOM SARAY 26.50866 82.597673
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6;Class PE-100 90 2.30
2 HDPE PIPE PN-6;Class PE-100 75 1.27
3 HDPE PIPE PN-6;Class PE-100 63 11.34
4 HDPE PIPE PN-6;Class PE-100 110 1.50
5 HDPE PIPE PN-6;Class PE-100 140 0.21
6 HDPE PIPE PN-6;Class PE-100 160 0.46
7 HDPE PIPE PN-6;Class PE-100 180 1.97
8 HDPE PIPE PN-6;Class PE-100 200 0.54
HSC Connection
Sno. Total Nos.
1 607
Other Details
3.11
3.11
3.10
02-Nov-2026
03-Nov-2026