Project Completion Certificate (Ground Water)
Scheme ID: 20063774 Name of Scheme: Kailai No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4190 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Jan-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 33.19/113.61 Kailai 26.302121 79.893266
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 93.70/70 Kailai 26.302121 79.893266
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/20 Kailai 26.302121 79.893266
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.025 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.10 As per Site
2 HDPE 75 2.291 As per Site
3 HDPE 90 0.677 As per Site
4 HDPE 110 1.931 As per Site
5 HDPE 125 2.285 As per Site
6 HDPE 180 1.020 As per Site
7 HDPE 200 0.185 As per Site
HSC Connection
Sno. Total Nos.
Other Details
3.87
3.62
3.62
31-Mar-2024
01-Apr-2024