| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20064173 | Name of Scheme: Amma Bhelaur Gram Panchayat Water Supply Scheme | No. of Villages: 6 | No. of Habitation Covered: 7 |
| Total Population Covered: 3130 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 05-Jul-2024 | Actual Date of Completion (Capex): 23-Dec-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Slotted Pipe 150mm | 22 | TW | 26.177137 | 83.747838 |
| 2 | Plane Pipe 150mm | 83.71 | TW | 26.177137 | 83.747838 |
| 3 | Plane Pipe 300mm | 42.12 | TW | 26.177137 | 83.747838 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Submersible Pump | 700/44 | TW | 26.177137 | 83.747838 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zinc Tank | 200/16 | OHT | 26.177136 | 83.747839 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 150mm | 150 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 PE-100 | 63 | 17.713 | |
| 2 | HDPE PN-6 PE-100 | 75 | 0.148 | |
| 3 | HDPE PN-6 PE-100 | 90 | 0.045 | |
| 4 | HDPE PN-6 PE-100 | 110 | 1.097 | |
| 5 | HDPE PN-6 PE-100 | 140 | 0.473 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 462 |