Project Completion Certificate (Ground Water)
Scheme ID: 20064749 Name of Scheme: Muhammadpur Babupur Gram Panchayat Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2010 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Jul-2024 Actual Date of Completion (Capex): 29-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted 150mm 24.04 TW 26.0020017 83.6264715
2 Plain Pipe 150mm 79.8 TW 26.0020017 83.6264715
3 Housing Pipe 200mm 42.14 TW 26.0020017 83.6264715
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 450/42 TW 26.0020017 83.6264715
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 150/14 OHT 26.0020017 83.6264715
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.02
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 15.29
2 HDPE Pipe PN-6: Class PE-100 75 0.23
3 HDPE Pipe PN-6: Class PE-100 110 0.07
HSC Connection
Sno. Total Nos.
1 346
Other Details
2.02
1.62
1.67
19-Sep-2025
29-Jan-2026