Project Completion Certificate (Ground Water)
Scheme ID: 20065024 Name of Scheme: BHAWANPUR No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2999 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jan-2024 Actual Date of Completion (Capex): 23-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.10/226.29 BHAWANPUR 26.61803 79.73992
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 750/62 BHAWANPUR 26.61803 79.73992
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/16 BHAWANPUR 26.61803 79.73992
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.007
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.541
2 HDPE 90 2.388
3 HDPE 110 1.154
4 HDPE 125 0.811
5 HDPE 140 1.043
HSC Connection
Sno. Total Nos.
Other Details
3.67
0.00
3.01
27-May-2024
28-May-2024