Project Completion Certificate (Ground Water)
Scheme ID: 20065123 Name of Scheme: KARAUNSA & MAIRAKHPUR No. of Villages: 3 No. of Habitation Covered: 1
Total Population Covered: 3656 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jan-2024 Actual Date of Completion (Capex): 21-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30/196.34 KARAUNSA & MAIRAKHPUR 26.35698 79.932198
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 850/74 KARAUNSA & MAIRAKHPUR 26.35698 79.932198
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/18 KARAUNSA & MAIRAKHPUR 26.35698 79.932198
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.01350
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.991
2 HDPE 110 1.197
3 HDPE 63 7.007
4 HDPE 140 0.455
5 HDPE 200 1.240
HSC Connection
Sno. Total Nos.
1 800
Other Details
4.25
0.00
3.42
04-Apr-2024
05-Apr-2024