| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065250 | Name of Scheme: Divariya PWS | No. of Villages: 4 | No. of Habitation Covered: 4 |
| Total Population Covered: 4953 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 0 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 04-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24.8/ 132.66 | DIVARIYA | 26.659686 | 79.332297 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 450 LPM/53M | DIVARIYA | 26.659686 | 79.332297 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125KL/ 16 M | DIVARIYA | 26.659686 | 79.332297 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 1 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4099 | |
| 2 | HDPE | 90 | 722 | |
| 3 | HDPE | 110 | 1310 | |
| 4 | HDPE | 125 | 833 | |
| 5 | HDPE | 160 | 1055.5 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |