Scheme ID: 20065250 Name of Scheme: Divariya PWS No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 4953 Base Year: 2023 Intermediate Year: 2038 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 04-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.8/ 132.66 DIVARIYA 26.659686 79.332297
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 450 LPM/53M DIVARIYA 26.659686 79.332297
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125KL/ 16 M DIVARIYA 26.659686 79.332297
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 1
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4099
2 HDPE 90 722
3 HDPE 110 1310
4 HDPE 125 833
5 HDPE 160 1055.5
HSC Connection
Sno. Total Nos.
Other Details
1.80
0.00
0.00
02-Feb-2025
05-May-2025