Project Completion Certificate (Ground Water)
Scheme ID: 20065264 Name of Scheme: Antol PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2143 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 09-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.06 m / 129.30m Antol 26.499957 79.388361
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 500 lpm/ 61 m Antol 26.499957 79.388361
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 kl/ 14m Antol 26.499957 79.388361
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.008
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.228
2 HDPE 90 2.984
3 HDPE 110 0.337
4 HDPE 125 0.806
5 HDPE 140 0.279
HSC Connection
Sno. Total Nos.
1 493
Other Details
1.94
0.00
0.00
08-Feb-2024
10-Feb-2024