Project Completion Certificate (Ground Water)
Scheme ID: 20065285 Name of Scheme: Raipur Phaphoond PWS No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3603 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 23-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.8 M / 105.43 M RAIPUR PHAPHUND 26.674571 79.336226
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 800 LPM / 57 M RAIPUR PHAPHUND 26.674571 26.674571
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL / 20 M RAIPUR PHAPHUND 26.674571 26.674571
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.006
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.062
2 HDPE 90 1.502
3 HDPE 110 0.171
4 HDPE 125 0.165
5 HDPE 140 0.225
6 HDPE 160 2.714
7 HDPE 180 0.692
8 HDPE 200 1.291
HSC Connection
Sno. Total Nos.
1 689
Other Details
3.17
0.00
3.24
22-Mar-2025
24-Mar-2025