Project Completion Certificate (Ground Water)
Scheme ID: 20065966 Name of Scheme: PALIA PURAB WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 5122 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Aug-2024 Actual Date of Completion (Capex): 03-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MS PIPE 300MM TO 150MM 20MTR / 112.8 PALIA PURAB 26.383527 81.786519
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 700/ 54MTR PALIA PURAB 26.383527 81.786519
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 200KL / 16MTR PALIA PURAB 26.383527 81.786519
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 .044
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDFPE PIPE 63MM-200MM 200 15.145
HSC Connection
Sno. Total Nos.
1 607
Other Details
3.75
0.00
3.75
06-May-2025
12-Nov-2025