| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065966 | Name of Scheme: PALIA PURAB WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 5122 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 03-Aug-2024 | Actual Date of Completion (Capex): 03-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MS PIPE 300MM TO 150MM | 20MTR / 112.8 | PALIA PURAB | 26.383527 | 81.786519 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 700/ 54MTR | PALIA PURAB | 26.383527 | 81.786519 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 200KL / 16MTR | PALIA PURAB | 26.383527 | 81.786519 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | .044 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDFPE PIPE 63MM-200MM | 200 | 15.145 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 607 |