| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066058 | Name of Scheme: PINDARA KARNAI WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 5376 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 04-Aug-2024 | Actual Date of Completion (Capex): 26-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MS PIPE 300MM - 150MM | 16MTR / 78.5 | PINDRA KARNAI | 26.376905 | 81.768603 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 750 / 52MTR | PINDRA KARNAI | 26.376905 | 81.768603 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 225KL / 14MTR | PINDRA KARNAI | 26.376905 | 81.768603 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | .021 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE 63MM TO 200MM | 200 | 10.225 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 677 |