Project Completion Certificate (Ground Water)
Scheme ID: 20066134 Name of Scheme: MAHALJANA GP WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2598 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Nov-2024 Actual Date of Completion (Capex): 09-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 18.15 M / 114.96 M MAHALJANA 29.234672 77.504719
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150 LPM / 60 M MAHALJANA 29.234672 77.504719
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75 KL /14 M MAHALJANA 29.234672 77.504719
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.030 COMPLETED
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 .95377 COMPLETED
2 HDPE 75 .99250 COMPLETED
3 HDPE 63 3.52422 COMPLETED
HSC Connection
Sno. Total Nos.
1 448
Other Details
1.84
0.00
1.52
09-Jun-2026
10-Jun-2026