| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066303 | Name of Scheme: Ghanapur | No. of Villages: 6 | No. of Habitation Covered: 7 |
| Total Population Covered: 6074 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2024 | Actual Date of Completion (Capex): 13-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well 300X200 | 12/156.80 | Ghanapur | 25.586787 | 82.52513 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-25HP | 1250/48 | Ghanapur | 25.586787 | 82.52513 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 350KL/14M | Ghanapur | 25.586587 | 82.524577 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 200 | 0.0167 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 200 | 0.042 | |
| 2 | HDPE PIPE PN-6 | 160 | 0.450 | |
| 3 | HDPE PIPE PN-6 | 140 | 2.567 | |
| 4 | HDPE PIPE PN-6 | 110 | 2.914 | |
| 5 | HDPE PIPE PN-6 | 90 | 1.707 | |
| 6 | HDPE PIPE PN-6 | 75 | 2.313 | |
| 7 | HDPE PIPE PN-6 | 63 | 17.400 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 858 |