| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066503 | Name of Scheme: SEMRAUTA VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 13 |
| Total Population Covered: 1717 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Dec-2023 | Actual Date of Completion (Capex): 06-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL - 1 | 13.68/74.84 | SEMRAUTA | 26.4558362 | 81.406529 |
| 2 | TUBEWELL-2 | 15.2/56.62 | SEMRAUTA | 26.452320 | 81.403953 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE -1 | 775 LPM/54M | SEMRAUTA | 26.4558362 | 81.406529 |
| 2 | SUBMERSIBLE-2 | 775 LPM/56 M | SEMRAUTA | 26.452320 | 81.403953 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 450/18 | SEMRAUTA | 26.4558362 | 81.406529 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.817 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 6.823 | |
| 2 | HDPE | 110 | 2.407 | |
| 3 | HDPE | 125 | 0.363 | |
| 4 | HDPE | 63 | 12.759 | |
| 5 | HDPE | 140 | 2.532 | |
| 6 | HDPE | 160 | 0.517 | |
| 7 | HDPE | 200 | 0.806 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1226 |