Project Completion Certificate (Ground Water)
Scheme ID: 20067357 Name of Scheme: AMARTAL Water Supply Scheme No. of Villages: 3 No. of Habitation Covered: 11
Total Population Covered: 7580 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 25-Apr-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of aboveTubewwll assembly 43.5/100 Amartal 26.354623 82.630947
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submercible pumping plant 1500/48 Amartal 26.35 82.63
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 425/18 Amartal 26.354 82.630
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 200 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 3.191
2 HDPE Pipe PN-6: Class PE-100 75 5.968
3 HDPE Pipe PN-6: Class PE-100 63 26.629
4 HDPE Pipe PN-6: Class PE-100 110 3.714
5 HDPE Pipe PN-6: Class PE-100 140 1.075
6 HDPE Pipe PN-6: Class PE-100 160 2.480
7 HDPE Pipe PN-6: Class PE-100 200 0.539
HSC Connection
Sno. Total Nos.
1 1050
Other Details
5.53
5.53
5.38
25-Apr-2026
27-Apr-2026