Project Completion Certificate (Ground Water)
Scheme ID: 20067467 Name of Scheme: MAHRIPUR Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 6
Total Population Covered: 6220 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Feb-2024 Actual Date of Completion (Capex): 31-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 32.18/55.00 MAHRIPUR 26.583879 82.62612
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Sumbersible Pump 25 HP 1.35/44 MAHRIPUR 26.583879 82.62612
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 375 KL/14 M MAHRIPUR 26.583879 82.62612
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI -K7 200 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6;CLASS PE-100 90 1.65
2 HDPE PIPE PN-6;CLASS PE-100 75 1.18
3 HDPE PIPE PN-6;CLASS PE-100 63 8.09
4 HDPE PIPE PN-6;CLASS PE-100 110 0.85
5 HDPE PIPE PN-6;CLASS PE-100 140 2.24
6 HDPE PIPE PN-6;CLASS PE-100 160 0.28
7 HDPE PIPE PN-6;CLASS PE-100 180 0.10
8 HDPE PIPE PN-6;CLASS PE-100 200 0.14
HSC Connection
Sno. Total Nos.
1 821
Other Details
3.63
3.63
3.66
25-Oct-2026