Project Completion Certificate (Ground Water)
Scheme ID: 20067539 Name of Scheme: ABDULLA NAGAR JJM No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 8520 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Sep-2024 Actual Date of Completion (Capex): 22-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 42M/133M ABDULLA NAGAR 27.687368 80.162920
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 104.4M³/47M ABDULLA NAGAR 27.687368 80.162920
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 500KL/18M ABDULLA NAGAR 27.687368 80.162920
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.002
2 DI PIPE 250 0.041
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 6.475
2 HDPE PIPE 75 7.483
3 HDPE PIPE 90 3.160
4 HDPE PIPE 110 1.113
5 HDPE PIPE 125 0.453
6 HDPE PIPE 140 0.541
7 HDPE PIPE 160 0.00
8 HDPE PIPE 180 0.035
9 HDPE PIPE 200 1.040
10 DI PIPE 200 1.088
11 DI PIPE 250 1.157
HSC Connection
Sno. Total Nos.
1 1601
Other Details
5.26
0.00
5.26
21-Sep-2025
25-Sep-2025