| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067539 | Name of Scheme: ABDULLA NAGAR JJM | No. of Villages: 1 | No. of Habitation Covered: 10 |
| Total Population Covered: 8520 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Sep-2024 | Actual Date of Completion (Capex): 22-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 42M/133M | ABDULLA NAGAR | 27.687368 | 80.162920 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 104.4M³/47M | ABDULLA NAGAR | 27.687368 | 80.162920 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 500KL/18M | ABDULLA NAGAR | 27.687368 | 80.162920 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.002 | |
| 2 | DI PIPE | 250 | 0.041 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 6.475 | |
| 2 | HDPE PIPE | 75 | 7.483 | |
| 3 | HDPE PIPE | 90 | 3.160 | |
| 4 | HDPE PIPE | 110 | 1.113 | |
| 5 | HDPE PIPE | 125 | 0.453 | |
| 6 | HDPE PIPE | 140 | 0.541 | |
| 7 | HDPE PIPE | 160 | 0.00 | |
| 8 | HDPE PIPE | 180 | 0.035 | |
| 9 | HDPE PIPE | 200 | 1.040 | |
| 10 | DI PIPE | 200 | 1.088 | |
| 11 | DI PIPE | 250 | 1.157 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1601 |