Project Completion Certificate (Ground Water)
Scheme ID: 20067557 Name of Scheme: FAZALPUR DHAKI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3522 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 19-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 30/125 Fazalpur Dhaki 29.186216 78.319626
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 52/750 Fazalpur Dhaki 29.186216 78.319626
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/14 Fazalpur Dhaki 29.186216 78.319626
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.112
2 HDPE 75 0.356
3 HDPE 90 0.311
4 HDPE 110 0.169
5 HDPE 125 0.108
6 HDPE 160 0.120
7 HDPE 180 0.688
HSC Connection
Sno. Total Nos.
1 704
Other Details
2.26
0.00
2.28
19-Nov-2025
20-Nov-2025