Scheme ID: 20067916 Name of Scheme: CHANDIPUR KALAN Water Supply Scheme No. of Villages: 7 No. of Habitation Covered: 9
Total Population Covered: 3730 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Mar-2024 Actual Date of Completion (Capex): 04-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Borewell Assembaly 30.11 M/ 74.34 M Chandipur Kalan 26.408815 83.059555
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 780 LPM/ 45M Chandipur Kalan 26.408815 83.059555
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 225 M/ 14 M Chandipur Kalan 26.408815 83.059555
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.0381
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 2.400
2 HDPE Pipe PN-6: Class PE-100 75 2.152
3 HDPE Pipe PN-6: Class PE-100 63 18.106
4 HDPE Pipe PN-6: Class PE-100 140 4.433
5 HDPE Pipe PN-6: Class PE-100 180 0.226
6 HDPE Pipe PN-6: Class PE-100 200 0.105
HSC Connection
Sno. Total Nos.
1 615
Other Details
3.37
3.37
3.37
19-Jun-2026