Project Completion Certificate (Ground Water)
Scheme ID: 20068308 Name of Scheme: BIJGAWAN JJM No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3370 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Sep-2024 Actual Date of Completion (Capex): 23-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24M/112M BIJGAWAN 27.651900 80.126442
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 42M³/45M BIJGAWAN 27.651900 80.126442
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200KL/16M BIJGAWAN 27.651900 80.126442
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.002
2 DI PIPE 150 0.025
3 DI PIPE 200 0.002
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 4.161
2 HDPE PIPE PN:-6 75 3.535
3 HDPE PIPE PN:-6 90 4.379
4 HDPE PIPE PN:-6 110 0.295
5 HDPE PIPE PN:-6 125 0.00
6 HDPE PIPE PN:-6 140 0.00
7 HDPE PIPE PN:-6 160 1.315
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.874
HSC Connection
Sno. Total Nos.
1 615
Other Details
2.67
0.00
2.69
22-Jun-2025
28-Sep-2025