Project Completion Certificate (Ground Water)
Scheme ID: 20068352 Name of Scheme: BILOLPUR WSS No. of Villages: 7 No. of Habitation Covered: 7
Total Population Covered: 2260 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2024 Actual Date of Completion (Capex): 16-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.07/86.80 Jajaura 26° 30' 8.0568" N 82° 23' 19.4928" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 24/44 Jajaura 26° 30' 8.0568" N 82° 23' 19.4928" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tanks 100/14 Jajaura 26° 30' 8.0568" N 82° 23' 19.4928" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.147
2 HDPE Pipe PN-6: Class PE-100 75 1.562
3 HDPE Pipe PN-6: Class PE-100 90 1.325
4 HDPE Pipe PN-6: Class PE-100 110 1.213
5 HDPE Pipe PN-6: Class PE-100 140 1.822
HSC Connection
Sno. Total Nos.
1 300
Other Details
1.81
0.00
0.00
31-Oct-2026
01-Nov-2026