Scheme ID: 20068679 Name of Scheme: BAHUWAR KALAN WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2712 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Aug-2024 Actual Date of Completion (Capex): 22-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MSERW PLAIN PIPE-200 MM 36 BAHUWAR KALAN 27.227063 83.728864
2 MSERW PLAIN PIPE-150 MM 48.8 BAHUWAR KALAN 27.227063 83.728864
3 MSERW SLOTTED PIPE-150 MM 18 BAHUWAR KALAN 27.227063 83.728864
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 35.99/37 BAHUWAR KALAN 27.227063 83.728864
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZINC ALM OHT 175KL/12M BAHUWAR KALAN 27.37235 83.805608
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DOUBLE FLANGE DI-K9 150 0.0216
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6/PE-100/HDPE 63 6.0483
2 PN-6/PE-100/HDPE 75 2.894
3 PN-6/PE-100/HDPE 90 1.5268
4 PN-6/PE-100/HDPE 110 0.700
5 PN-6/PE-100/HDPE 140 0.552
HSC Connection
Sno. Total Nos.
1 629
Other Details
1.80
0.00
2.06
24-Jun-2026