Project Completion Certificate (Ground Water)
Scheme ID: 20068717 Name of Scheme: FATEHPUR NARAIN, NITYANANDPUR & SADULLAPUR No. of Villages: 5 No. of Habitation Covered: 5
Total Population Covered: 1848 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 15-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.13 Mtr / 99.03 Mtr FATEHPURPREM-DABKEHRI-RATHAORAKALAN-HARIPUR-PARTAPUR HANSAPUR 29.232322 78.085416
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 400 LPM / 50 Mtr FATEHPURPREM-DABKEHRI-RATHAORAKALAN-HARIPUR-PARTAPUR HANSAPUR 29.232322 78.085416
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 Kl / 14 M FATEHPURPREM-DABKEHRI-RATHAORAKALAN-HARIPUR-PARTAPUR HANSAPUR 29.232322 78.085416
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0261
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.324
2 HDPE 90 2.972
3 HDPE 110 0.113
4 HDPE 140 1.335
5 HDPE 160 3.385
6 HDPE 180 0.415
HSC Connection
Sno. Total Nos.
1 298
Other Details
2.72
2.72
2.24
01-Jan-2025
02-Jan-2025