Project Completion Certificate (Ground Water)
Scheme ID: 20068759 Name of Scheme: Bhagwanpur WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2360 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 27-Aug-2024 Actual Date of Completion (Capex): 27-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MSERW Plain Pipe DIA-200MM 36.04 BHAGWANPUR 27.362387 83.717713
2 MSERW Plain Pipe DIA-150MM 81.98 BHAGWANPUR 27.362387 83.717713
3 MSERW SLOTTED PIPE DIA-150MM 18.01 BHAGWANPUR 27.362387 83.717713
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 26.99/37 BHAGWANPUR 27.362387 83.717713
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 REGULAR OHT 150KL/12M BHAGWANPUR 27.362387 83.717713
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DOUBLE FLANGED PIPE/DI 150 0.0267
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6,PE-100/HDPE 63 1.439
2 PN-6,PE-100/HDPE 75 0.841
3 PN-6,PE-100/HDPE 90 0.893
4 PN-6,PE-100/HDPE 110 0.618
5 PN-6,PE-100/HDPE 140 0.236
HSC Connection
Sno. Total Nos.
1 311
Other Details
1.40
0.00
1.51
28-Aug-2026
28-Aug-2026