Scheme ID: 20069079 Name of Scheme: SAKOTI & TANDA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 7944 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 15-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 44.2 Mtr / 96.05 Mtr SAKOTI - TANDA 29.183678 77.710511
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1500 LPM / 54 Mtr SAKOTI - TANDA 29.183678 77.710511
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 450 Kl / 16 M SAKOTI - TANDA 29.183678 77.710511
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.00232
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.892
2 HDPE 90 3.083
3 HDPE 110 1.261
4 HDPE 125 0.812
5 HDPE 140 1.256
6 HDPE 160 0.395
HSC Connection
Sno. Total Nos.
1 1398
Other Details
5.47
5.47
4.42
09-Aug-2025
10-Aug-2025