| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20069237 | Name of Scheme: Pipara Kazi WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 4629 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 24-Mar-2024 | Actual Date of Completion (Capex): 01-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MSERW Plain Pipe 300mm | 36M | Pipara Kazi | 27.309828 | 83.693371 |
| 2 | MSERW Plain Pipe 150 mm | 103.80M | Pipara Kazi | 27.309828 | 83.693371 |
| 3 | MSERW Slotted Pipe 150mm | 30M | Pipara Kazi | 27.309828 | 83.693371 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 58.78 /43M | Pipara Kazi | 27.309828 | 83.693371 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Regular Over Head Tank | 300KL/18M | Pipara Kazi | 27.309820 | 83.693178 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Double Flange / DI ( K-9 ) | 150 | .0234 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6,PE-100 /HDPE | 140 | 0.6252 | |
| 2 | PN-6,PE-100 /HDPE | 110 | 1.627 | |
| 3 | PN-6,PE-100 /HDPE | 90 | 3.8896 | |
| 4 | PN-6,PE-100 /HDPE | 75 | 2.2893 | |
| 5 | PN-6,PE-100 /HDPE | 63 | 5.4406 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 645 |