Project Completion Certificate (Ground Water)
Scheme ID: 20069338 Name of Scheme: MAHMUDPUR & PARSA WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 2530 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 05-Feb-2024 Actual Date of Completion (Capex): 04-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22.00/210.00 MAHMUDPUR & PARSA 26.372897 82.247615
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 540LPM/45M MAHMUDPUR & PARSA 26.372897 82.247615
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/14M MAHMUDPUR & PARSA 26.372897 82.247615
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 6.744
2 HDPE-PN-6 , PE-100 75 3.193
3 HDPE-PN-6 , PE-100 90 0.532
4 HDPE-PN-6 , PE-100 110 1.312
5 HDPE-PN-6 , PE-100 140 0.718
6 HDPE-PN-6 , PE-100 160 3.856
HSC Connection
Sno. Total Nos.
1 396
Other Details
2.11
0.00
2.46
18-Apr-2026
01-May-2026