Project Completion Certificate (Ground Water)
Scheme ID: 20069757 Name of Scheme: Turkahiya WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2638 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-2024 Actual Date of Completion (Capex): 26-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MSERW Plain Pipe DIA-200MM 36.28 TURKAHIYA 27.397886 83.709931
2 MSERW Plain Pipe DIA-150MM 93.03 TURKAHIYA 27.397886 83.709931
3 MSERW SLOTTED PIPE DIA-150MM 17.02 TURKAHIYA 27.397886 83.709931
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 35.99/37 TURKAHIYA 27.397886 83.709931
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 REGULAR OHT 175KL/12M TURKAHIYA 27.397886 83.709931
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DOUBLE FLANGED PIPE/DI 150 0.0263
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6,PE-100/HDPE 63 2.883
2 PN-6,PE-100/HDPE 75 1.076
3 PN-6,PE-100/HDPE 90 1.103
4 PN-6,PE-100/HDPE 125 0.301
HSC Connection
Sno. Total Nos.
1 473
Other Details
1.76
0.00
1.75
26-Aug-2026
27-Aug-2026