| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20070851 | Name of Scheme: PARIKALA WATER SUPPLY SCHEME | No. of Villages: 4 | No. of Habitation Covered: 4 |
| Total Population Covered: 3148 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Sep-2024 | Actual Date of Completion (Capex): 30-May-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MSERW Plain Pipe DIA-300MM | 36.19 | PARIKALA | 27.275276 | 83.666992 |
| 2 | MSERW Plain Pipe DIA-200MM | 84.01 | PARIKALA | 27.275276 | 83.666992 |
| 3 | MSERW SLOTTED PIPE DIA-200MM | 16 | PARIKALA | 27.275276 | 83.666992 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 41.99/39 | PARIKALA | 27.275276 | 83.666992 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | REGULAR OHT | 200KL/12M | PARIKALA | 27.275327 | 83.666898 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DOUBLE FLANGED PIPE/DI | 150 | 0.0296 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6,PE-100/HDPE | 63 | 7.234 | |
| 2 | PN-6,PE-100/HDPE | 75 | 0.3682 | |
| 3 | PN-6,PE-100/HDPE | 90 | 0.541 | |
| 4 | PN-6,PE-100/HDPE | 125 | 0.4539 | |
| 5 | PN-6,PE-100/HDPE | 140 | 0.177 | |
| 6 | PN-6,PE-100/HDPE | 180 | 0.016 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 495 |