Scheme ID: 20070927 Name of Scheme: ISHAPUR & DEHRI KHURRAM MVS (O) No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3285 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2027 Actual Date of Completion (Capex): 15-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.05/116.05 Chak Dheeka Nagla 29.0211682 78.5403698
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 700/50 Chak Dheeka Nagla 29.0211682 78.5403698
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 200/18 Chak Dheeka Nagla 29.0211682 78.5403698
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.10440
2 PN-6 PE100/HDPE 75 0.4756
3 PN-6 PE100/HDPE 63 5.8305
4 PN-6 PE100/HDPE 110 0.2655
5 PN-6 PE100/HDPE 125 0.572
6 PN-6 PE100/HDPE 140 0.3755
7 PN-6 PE100/HDPE 160 1.3028
HSC Connection
Sno. Total Nos.
1 497
Other Details
2.85
0.00
0.00
27-Sep-2026
28-Sep-2026