Project Completion Certificate (Ground Water)
Scheme ID: 20071413 Name of Scheme: CHAK KARI BHIT GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 4405 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 09-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 20.00 M / 154.30 M Chakkari bhit 26.409844 81.871392
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 580 LPM / 50 M Chakkari bhit 26.409844 81.871392
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 KL / 18 M Chakkari bhit 26.409844 81.871392
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 125 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6:Class PE-100 63 7.054
2 HDPE / PN-6:Class PE-100 75 0.905
3 HDPE / PN-6:Class PE-100 110 0.368
4 HDPE / PN-6:Class PE-100 125 0.438
5 HDPE / PN-6:Class PE-100 140 0.389
6 HDPE / PN-6:Class PE-100 160 0.28
7 HDPE / PN-6:Class PE-100 180 1.487
8 HDPE / PN-6:Class PE-100 200 0.822
HSC Connection
Sno. Total Nos.
1 475
Other Details
2.55
0.00
2.62
11-Mar-2026
15-Mar-2026