Project Completion Certificate (Ground Water)
Scheme ID: 20071418 Name of Scheme: KALKHURA & MOHMADPUR GRAM PANCHYAT WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 12
Total Population Covered: 7960 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 26-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 35.07 M / 254.42 M KALKHURA & MOHMADPUR 26.420049 82.043949
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 565 & 500 LPM / 48 M KALKHURA & MOHMADPUR 26.420049 82.043949
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 KL / 16 M KALKHURA & MOHMADPUR 26.420049 82.043949
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 125 2.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6:Class PE-100 63 21.739
2 HDPE / PN-6:Class PE-100 75 1.058
3 HDPE / PN-6:Class PE-100 90 0.357
4 HDPE / PN-6:Class PE-100 110 1.592
5 HDPE / PN-6:Class PE-100 125 0.992
6 HDPE / PN-6:Class PE-100 140 0.404
7 HDPE / PN-6:Class PE-100 160 0.939
8 HDPE / PN-6:Class PE-100 180 0.588
9 HDPE / PN-6:Class PE-100 200 0.245
HSC Connection
Sno. Total Nos.
1 796
Other Details
4.61
0.00
4.72
30-May-2025
01-Jul-2025