| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20071503 | Name of Scheme: RASHARA&SADHRABHARI GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 6 | No. of Habitation Covered: 10 |
| Total Population Covered: 6445 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Jul-2024 | Actual Date of Completion (Capex): 27-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.03 M / 70.57 M | RASHARA&SADHRABHARI | 26.463372 | 81.922622 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 880 LPM / 50 M | RASHARA&SADHRABHARI | 26.463372 | 81.922622 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 275KL / 18 M | RASHARA&SADHRABHARI | 26.463372 | 81.922622 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K7 | 150 | 0.023 | |
| 2 | DI / K7 | 250 | 0.042 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / PN-6:Class PE-100 | 63 | 20.147 | |
| 2 | HDPE / PN-6:Class PE-100 | 75 | 2.879 | |
| 3 | HDPE / PN-6:Class PE-100 | 90 | 3.214 | |
| 4 | HDPE / PN-6:Class PE-100 | 110 | 0.639 | |
| 5 | HDPE / PN-6:Class PE-100 | 125 | 0.434 | |
| 6 | HDPE / PN-6:Class PE-100 | 140 | 1.111 | |
| 7 | HDPE / PN-6:Class PE-100 | 160 | 0.491 | |
| 8 | HDPE / PN-6:Class PE-100 | 200 | 0.57 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 723 |