Project Completion Certificate (Ground Water)
Scheme ID: 20072041 Name of Scheme: ISMILEPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 1490 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 05-Feb-2024 Actual Date of Completion (Capex): 04-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15.00/89.30 ISMILEPUR 26.462121 82.104113
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 320LPM/42M ISMILEPUR 26.462121 82.104113
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100KL/12M ISMILEPUR 26.462121 82.104113
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 5.379
2 HDPE-PN-6 , PE-100 75 1.834
3 HDPE-PN-6 , PE-100 90 1.028
4 HDPE-PN-6 , PE-100 110 0.369
5 HDPE-PN-6 , PE-100 140 0.362
HSC Connection
Sno. Total Nos.
1 355
Other Details
1.51
0.00
1.51
18-Apr-2026
01-May-2026