Project Completion Certificate (Ground Water)
Scheme ID: 20072603 Name of Scheme: CHANDPURA QADIM SV W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2298 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 17-Nov-2024 Actual Date of Completion (Capex): 08-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 16.20/96.04 Chandpura Qadim 28°44'32.14"N 79° 6'23.29"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible Pump 30/ 40 Chandpura Qadim 28°44'32.14"N 79° 6'23.29"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/ 12 Chandpura Qadim 28°44'32.68"N 79° 6'22.64"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.2366
2 HDPE Pipe PN-6: Class PE-100 75 .6132
3 HDPE Pipe PN-6: Class PE-100 63 2.7385
4 HDPE Pipe PN-6: Class PE-100 110 .3486
5 HDPE Pipe PN-6: Class PE-100 125 .3847
HSC Connection
Sno. Total Nos.
1 361
Other Details
1.64
0.00
1.61
08-Nov-2024
09-Nov-2024