Project Completion Certificate (Ground Water)
Scheme ID: 20073014 Name of Scheme: PURANPUR SVS (O) No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4120 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2027 Actual Date of Completion (Capex): 21-Apr-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Solar Powered Pump 30.18/110.7 Puranpur 28.8469966666667 78.509496666666666
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 880/46 Puranpur 28.8469966666667 78.509496666666666
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 250/14 Puranpur 28.846925 78.509631
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 1.178
2 PN-6 PE100/HDPE 75 0.193
3 PN-6 PE100/HDPE 63 4.8558
4 PN-6 PE100/HDPE 110 0.870
5 PN-6 PE100/HDPE 140 0.132
6 PN-6 PE100/HDPE 160 0.1486
7 PN-6 PE100/HDPE 180 0.1955
8 PN-6 PE100/HDPE 200 0.030
HSC Connection
Sno. Total Nos.
1 622
Other Details
2.15
0.00
0.00
01-Aug-2026
02-Aug-2026