| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20073772 | Name of Scheme: Dudupur WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1617 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Oct-2024 | Actual Date of Completion (Capex): 04-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 18 M/86.06 M | Dudupur | 28.318249 | 77.863629 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 350 LPM/44 M | Dudupur | 28.318249 | 77.863629 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 100 KL/12 M | Dudupur | 28.318369 | 77.863488 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 23.70 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.08 | |
| 2 | HDPE | 75 | 0.11 | |
| 3 | HDPE | 90 | 0.24 | |
| 4 | HDPE | 110 | 0.14 | |
| 5 | HDPE | 125 | 0.45 | |
| 6 | HDPE | 140 | 0.022 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 455 |