Project Completion Certificate (Ground Water)
Scheme ID: 20073777 Name of Scheme: Thulrai No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2070 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Mar-2024 Actual Date of Completion (Capex): 17-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 22.00/134.30 Thulrai 26.63958 79.12188
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 27.01(M³/Hr.)/46Mtr. Thulrai 26.63958 79.12188
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/16 Thulrai 26.63958 79.12188
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.0240
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.448
2 HDPE 75 1.802
3 HDPE 90 1.094
4 HDPE 110 1.436
5 HDPE 140 1.495
6 HDPE 160 1.343
7 HDPE 180 1.514
8 HDPE 200 0.202
HSC Connection
Sno. Total Nos.
1 449
Other Details
1.86
2.61
2.61
17-Jan-2025
18-Jan-2025