| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20073777 | Name of Scheme: Thulrai | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 2070 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 15-Mar-2024 | Actual Date of Completion (Capex): 17-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 22.00/134.30 | Thulrai | 26.63958 | 79.12188 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 27.01(M³/Hr.)/46Mtr. | Thulrai | 26.63958 | 79.12188 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | Thulrai | 26.63958 | 79.12188 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.0240 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.448 | |
| 2 | HDPE | 75 | 1.802 | |
| 3 | HDPE | 90 | 1.094 | |
| 4 | HDPE | 110 | 1.436 | |
| 5 | HDPE | 140 | 1.495 | |
| 6 | HDPE | 160 | 1.343 | |
| 7 | HDPE | 180 | 1.514 | |
| 8 | HDPE | 200 | 0.202 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 449 |