Project Completion Certificate (Ground Water)
Scheme ID: 20075210 Name of Scheme: PAMIPUR WSS No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3540 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Mar-2024 Actual Date of Completion (Capex): 07-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.32 /54.64 PAMIPUR 26° 19' 22.17" N 82° 51' 29.25" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 30/43 PAMIPUR 26° 19' 22.17" N 82° 51' 29.25" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 175/14 PAMIPUR 26° 19' 22.17" N 82° 51' 29.25" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 8.489
2 HDPE Pipe PN-6: Class PE-100 90 0.49
3 HDPE Pipe PN-6: Class PE-100 110 1.615
4 HDPE Pipe PN-6: Class PE-100 140 0.361
5 HDPE Pipe PN-6: Class PE-100 75 5.732
6 HDPE Pipe PN-6: Class PE-100 160 0.72
HSC Connection
Sno. Total Nos.
1 566
Other Details
2.32
0.00
0.00
19-Oct-2026
20-Oct-2026