| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20076451 | Name of Scheme: THAURI & DICHAULI WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 11 |
| Total Population Covered: 12961 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 15-Sep-2024 | Actual Date of Completion (Capex): 24-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MS PIPE 300MM AND 150MM | 106M/266.9M | THAURI & DICHAULI | 26.480279 | 81.732353 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 850LPM/56M | THAURI & DICHAULI | 26.480279 | 81.732353 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 800KL/18M | THAURI & DICHAULI | 26.480279 | 81.732353 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.782 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE 63MM TO 200MM | 200 | 48.607 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 2122 |