Project Completion Certificate (Ground Water)
Scheme ID: 20076536 Name of Scheme: PURE PREM SHAH WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2420 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Sep-2024 Actual Date of Completion (Capex): 29-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MS PIPE 300MM AND 150MM 22M/73.3M PURE PREM SHAH 26.383211 81.774719
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 510LPM/54M PURE PREM SHAH 26.383211 81.774719
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150KL/16M PURE PREM SHAH 26.383211 81.774719
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63MM TO 160MM 160 10.804
HSC Connection
Sno. Total Nos.
1 512
Other Details
2.77
0.00
2.76
30-Jun-2025
06-Oct-2025