Project Completion Certificate (Ground Water)
Scheme ID: 20076870 Name of Scheme: BHUSERA SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1692 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 31-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 10MTR / 56.60MTR BHUSERA 27.40330 79.67133
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 350 LPM / 59 MTR BHUSERA 27.40330 79.67133
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 12 MTR BHUSERA 27.40330 79.67133
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .011 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 6KG 90 .198 COMPLETE
2 HDPE 6KG 63 1.867 COMPLETE
3 HDPE 6KG 110 .141 COMPLETE
4 HDPE 6KG 140 .153 COMPLETE
HSC Connection
Sno. Total Nos.
1 182
Other Details
1.26
1.23
1.17
31-May-2024
01-Jun-2024